Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.