Due to water ingress we carried out a detailed inspection of all membranes and fittings and gave a full report to the client along with potential works to rectify the problem. We also identified and specified the areas that should still be covered under warranty from the original roofing company that repacked the roof allowing the client to potentially make a specific and detailed claim. See associated pictures.
RECENT JOBS
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.
Gully Replacement
A planned groundworks job to replace broken and loose gully slabs.
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.