Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Ice-cream van damage repair
Our groundworks team attended a retail park in order to repair a bollard and loose payment slabs damaged by an ice cream van.
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.
Water ingress inspection
Our roofing team attended a central London commercial building in order to investigate water ingress.
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.
Pavement repair
Our groundworks team attended a retail park to repair a pavement.