Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.
Water ingress inspection
Our roofing team attended a central London commercial building in order to investigate water ingress.
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.
Pavement repair
Our groundworks team attended a retail park to repair a pavement.
Repair of gas leak
Our reactive gas team attended a commercial building in order to attend a reported gas leak.