Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Gutter Cleaning
Our planned preventative maintenance team attended in order to clear gutters on a business park.
Roof inspection and repair
Our commercial roofing team travelled to The Midlands to inspect and repair a roof suffering from water ingress.
Replacement of faulty lights
Our electrical team attended an emergency call out and replaced faulty lights.
Brickwork at retail centre
Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report.
Car park Lining
Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material to form markings.
Installation of bollard sleeves
Our reactive maintenance team attended a retail/industrial site and fitted bollard sleeves securely.