Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Corona-ready signage
Our reactive maintenance team visited a commercial building in order fix signs in line with heath and safety guidance to prevent corona spread.
Fixing Corona screens to reception
Our reactive team visited a commercial property in order to fix screens at the reception area in order to protect reception and visitors from the corona once the building reopened.
Fire door replacement
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...