Planned maintenance in response to a health and safety review. We carried out various groundworks including pothole repair and tarmac repair where the road was in poor condition and presented a trip hazard. Old parking bollard holes that were no longer used were also filled with concrete so that they did not present any risk to third parties.
RECENT JOBS
Electrical Installation
Our electrical team attended a central London commercial building for an installation.
Removal of fly tipping
Our waste removal team attended a retail park where there had been a significant amount of fly tipping.
Replacement of broken glass panel
Our glazing team attended a commercial centre and removed a damaged glass pane and replaced.
New post fabrication and removal of CCTV
Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV.
Installation of LED lights
Our commercial electrical team attended an industrial estate in order to new LED lighting.
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.