Planned maintenance in response to a health and safety review. We carried out various groundworks including pothole repair and tarmac repair where the road was in poor condition and presented a trip hazard. Old parking bollard holes that were no longer used were also filled with concrete so that they did not present any risk to third parties.

RECENT JOBS

  1. 1
  2. 2
  3. 3
  4. 4

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-07-23T15:01:20+02:00