Planned maintenance in response to a health and safety review. We carried out various groundworks including pothole repair and tarmac repair where the road was in poor condition and presented a trip hazard. Old parking bollard holes that were no longer used were also filled with concrete so that they did not present any risk to third parties.
RECENT JOBS
Quarterly Refurbishment – Retail Park
Quarterly visit including electrics - signs and trip hazards.
Securing of Site with Concrete Blocks
Unwanted visitors can result in significant damage and legal fees - we are experienced at securing sites using concrete and digging trenches and building up earth mounds.
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.