Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door