Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...
Groundworks business centre
Our groundworks team attended site - lifted areas of dropped and risen block paving that had created a trip hazard in the car park...
External decoration of retail complex
Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex
Jet Washing
Our cleaning team attended a commercial building where the stairs leading from the car park had become both unsightly and a potential hazard.