Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Line Marking
Additional numbered parking was required at a retail site.
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler