Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment
Repaint edging of steps
Our preventative maintenance team attended a retail park in response to an issue raised in a health and safety review.
Graffiti removal
Our reactive maintenance team attended a business park in order to remove offensive graffiti and potential liable against ‘Jimmy ‘.
Repair of raised paving
Repair of raised paving
Reconstruction of fence
Our reactive team attended in order to repair a defective fence.