Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.