Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Replacement of broken glass panel
Our glazing team attended a commercial centre and removed a damaged glass pane and replaced.
New post fabrication and removal of CCTV
Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV.
Installation of LED lights
Our commercial electrical team attended an industrial estate in order to new LED lighting.
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.
Signage Installation
Our planned maintenance team attended a commercial centre and installed a a dead end sign at the entrance of the complex.
Interior Decoration
Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working.