Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Electrical Installation
Our electrical team attended a central London commercial building for an installation.
Removal of fly tipping
Our waste removal team attended a retail park where there had been a significant amount of fly tipping.
Replacement of broken glass panel
Our glazing team attended a commercial centre and removed a damaged glass pane and replaced.
New post fabrication and removal of CCTV
Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV.
Installation of LED lights
Our commercial electrical team attended an industrial estate in order to new LED lighting.
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.