Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.