Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.