Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.
RECENT JOBS
Health and safety hazard repair
Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing