Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.
RECENT JOBS
Entrance Doors
Installation of entrance doors to ensure good first impressions of commercial office building.
Bollard Installation
Installation of bollard to protect pavement.
Height Restrictor
Repair of height restrictor.
Drone Survey
Drone survey of residential flat roof to check for source of water ingress.
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.