Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.
RECENT JOBS
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor