Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Signage Installation
Our planned maintenance team attended a commercial centre and installed a a dead end sign at the entrance of the complex.
Interior Decoration
Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working.
Picnic facilities
Our reactive maintenance team attended a commercial premises in order to urgently install a picnic table so that people were able to take advantage of the weather.
Replacement of kerbs stones and paving slabs
Our planned maintenance team went to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard...
Fabrication and replacement of swing gate
Our planned maintenance team attended an industrial centre for fabrication and replacement of a swing gate
Kerb repair
Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road.