A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.