2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Clearing blocked gutters and downpipes
Our reactive maintenance team attended a commercial site where the bike store was suffering water ingress from a flooded roof due to the gutters and downpipes being blocked.
Sealing of flat roof above lift shaft
Our planned maintenance team attended a commercial building in order to service and seal a flat roof above a 10 story lift shaft to ensure that there would be no water ingress in to the lift shaft and thus preventing any future issues with the lift and its mechanical parts
Installation of access hatches
Our planned maintenance team attended a site in Canary Wharf and installed 4 * access hatched into the rear of kitchen cupboards to facilitate easy access to utilities
New post and sign
Our planned maintenance team attended an industrial site and installed a new standing post and 15mph speed sign as a health and safety measure.
Replacement of damaged safety barrier
Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk.
Freddy the falcon
Seagulls were creating a health and safety issue at an industrial site.