2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Removal of fly tipping
Our waste removal team attended a retail park where there had been a significant amount of fly tipping.
Replacement of broken glass panel
Our glazing team attended a commercial centre and removed a damaged glass pane and replaced.
New post fabrication and removal of CCTV
Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV.
Installation of LED lights
Our commercial electrical team attended an industrial estate in order to new LED lighting.
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.
Signage Installation
Our planned maintenance team attended a commercial centre and installed a a dead end sign at the entrance of the complex.