2 man team to attend site to carry out the following:
Dig out area at the front of the building as marked by client
Install 3.5m galvanised sign post concreted into the ground
Attached 300x400mm “Assembly Point” aluminium sign to the new post
Leave site clean and tidy
RECENT JOBS
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment
Repaint edging of steps
Our preventative maintenance team attended a retail park in response to an issue raised in a health and safety review.
Graffiti removal
Our reactive maintenance team attended a business park in order to remove offensive graffiti and potential liable against ‘Jimmy ‘.
Repair of raised paving
Repair of raised paving
Reconstruction of fence
Our reactive team attended in order to repair a defective fence.
Installation of new roof hatches
Installation of new roof hatches