Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights
Redecoration
Our planned maintenance team attended a premier Mayfair office - repainted all walls and ceilings in common areas out of hours.
Clearing blocked gutters and downpipes
Our reactive maintenance team attended a commercial site where the bike store was suffering water ingress from a flooded roof due to the gutters and downpipes being blocked.