Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Line Marking
Our team attended an office park in order to apply thermostatic road markings
Electrical inspection and repair of external lighting
Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting.
Leak repair
Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
Vanity unit refurbishment
Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage.
Electrical Installation
Our electrical team attended a central London commercial building for an installation.
Removal of fly tipping
Our waste removal team attended a retail park where there had been a significant amount of fly tipping.