Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Ice-cream van damage repair
Our groundworks team attended a retail park in order to repair a bollard and loose payment slabs damaged by an ice cream van.
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.
Water ingress inspection
Our roofing team attended a central London commercial building in order to investigate water ingress.
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.
Pavement repair
Our groundworks team attended a retail park to repair a pavement.