Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Replacement of leaking auto air vents
Our commercial plumbing team attended a medical centre where water leakage had been observed.
Health & Safety Repairs at Retail Park
Our reactive maintenance team visited a retail park where a number of minor Health and Safety issues had been raised.
Water Ingress
Our preventative maintenance team visited a commercial building in central London that had experienced a number of water ingress issues.
Road lining at retail park
Our planned maintenance team visited a retail park in order to repaint faded road markings.
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.