Planned maintenance – Refurbishment of toilets in office due to rising damp. We removed all existing flaking paintwork and prepared the area using hot air blowers (to dry the plaster out) then sanded. We then applied 2 coats of Stain Blocker (special waterproof coating that prevents stains from coming through fresh paint). When this was dry we then emulsioned the urinal back and side walls using Johnstones durable moisture resistant and washable acylic paint.
RECENT JOBS
Office adaptation for The Corona Virus
Our reactive maintenance team installed plastic screens in a commercial office in order to comply with Corona virus risk assessment.
Corona-ready signage
Our reactive maintenance team visited a commercial building in order fix signs in line with heath and safety guidance to prevent corona spread.
Fixing Corona screens to reception
Our reactive team visited a commercial property in order to fix screens at the reception area in order to protect reception and visitors from the corona once the building reopened.
Fire door replacement
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.