Planned maintenance in response to a health and safety review. We carried out various groundworks including pothole repair and tarmac repair where the road was in poor condition and presented a trip hazard. Old parking bollard holes that were no longer used were also filled with concrete so that they did not present any risk to third parties.
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.