Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Kerb repair
Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road.
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights