Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard. They used fire rated materials to fill gaps in the basement electrical cupboard and 2 larger holes either side where cables had been run.
RECENT JOBS
Fence Repair
Repair of fence that was presenting a health and safety hazard.
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme